This bucket hat is made with a durable 4-ply SUPPLEX recycled nylon that has a DWR (durable water repellent) finish and provides 50+ UPF sun protection. It’s reversible and has a generous brim to shield the head, face and neck, and a tuck-away chin strap with hook-and-loop fastener holds securely without chafing tender jawlines. Chin straps to tuck away when not needed. Packs small; easy care.
[tabtitlestart]Details[tabtitleend]Features
- Wind- and water-resistant 100% recycled nylon dries quickly and offers 50+ UPF sun protection
- Brim protects head, face and neck from sun
- Buttonholes in hat allow chin straps to thread onto reverse side; chin strap secures with a hook-and-loop fastener
- Reversible style with fun print and solid combinations
- Hat packs small; easy care
- Fair Trade Certified sewn
Specs
- 4.5-oz (prints: 4.3-oz) 100% recycled nylon with a DWR (durable water repellent) finish and 50+ UPF sun protection.
- Fabric is certified as bluesign approved.
- Fair Trade Certified sewn



















Reviews
There are no reviews yet.